SOLAR SHINE ENERGY

SOLAR PV PRE-INSTALLATION INSPECTION & SITE SURVEY FORM

Website: www.solarshineni.co.uk
Email: solarshinenergy@gmail.com


1. CUSTOMER & PROPERTY DETAILS

□ Customer name: ______________________________________

□ Installation address: _________________________________

□ Postcode: ___________________________________________

□ Telephone number: ___________________________________

□ Email address: ______________________________________

□ Property owner confirmed

□ Customer authority/permission confirmed

□ Domestic property

□ Commercial property

□ Landlord / rental property

□ New build

□ Existing property

□ Extension / renovation

Surveyor: __________________________________________

Survey date: ____ / ____ / ______

Survey reference: __________________________________


2. EXISTING ELECTRICAL SUPPLY

□ Electricity supply available

□ Single-phase supply

□ Three-phase supply

□ Consumer unit inspected

□ Consumer unit accessible

□ Consumer unit appears suitable for proposed installation

□ Main switch identified

□ Main earthing arrangement identified

□ Main bonding identified

□ Earthing conductor identified

□ Service cut-out identified

□ Electricity meter identified

□ Smart meter fitted

□ Import meter type recorded

Meter number: ______________________________________

MPAN: _____________________________________________

Existing supply rating: __________________________ A

MIC, if known: __________________________________ kVA

□ NIE Networks supply


3. EXISTING GENERATION & STORAGE

□ No existing generation

□ Existing solar PV

□ Existing battery storage

□ Existing wind generation

□ Other generation

Details: ___________________________________________

□ Existing inverter documentation available

□ Existing PV commissioning documentation available

□ Existing DNO/NIE approval available

□ Existing generation requires further assessment

Existing inverter manufacturer: ______________________

Existing inverter model: ____________________________

Existing inverter rating: _________________________ kW


4. PROPOSED SOLAR PV SYSTEM

□ Proposed system design completed

□ Panel manufacturer confirmed

□ Panel model confirmed

□ Panel wattage confirmed

□ Number of panels confirmed

□ Total DC system capacity calculated

Panel manufacturer: _________________________________

Panel model: _______________________________________

Panel wattage: __________________ W

Number of panels: __________________

Total DC capacity: ________________ kWp

□ String inverter

□ Hybrid inverter

□ Microinverters

Inverter manufacturer: ______________________________

Inverter model: ____________________________________

Inverter capacity: __________________ kW

□ Battery included

□ Battery not included

Battery manufacturer: ______________________________

Battery model: _____________________________________

Battery capacity: __________________ kWh

□ EV charger proposed

□ Heat pump

□ Immersion/diverter

□ Other significant electrical load


5. NIE NETWORKS / DNO CONNECTION

□ Existing electrical supply assessed

□ G98 requirements considered

□ G99 requirements considered

□ G100 requirements considered

□ DNO/NIE application required

□ DNO/NIE application submitted

□ DNO/NIE approval received

□ DNO/NIE reference recorded

NIE reference: _____________________________________

□ Maximum generation capacity confirmed

□ Maximum export capacity confirmed

Maximum proposed export: ________________ kW

Maximum proposed generation: _____________ kW

□ Export limitation required

□ Export limitation equipment required

□ Customer advised of DNO/NIE requirements

□ Customer advised that connection must not proceed until required approval/notification requirements have been satisfied


6. ROOF INSPECTION

□ Roof visually inspected

□ Pitched roof

□ Flat roof

□ Hipped roof

□ Gable roof

□ Other roof type

Roof type/details: _________________________________

□ Concrete tiles

□ Clay tiles

□ Slate

□ Fibre cement

□ Metal

□ Membrane

□ Other roof covering

Roof covering: _____________________________________

Approximate roof age: __________________ years

□ No obvious structural defects

□ No obvious water ingress

□ No obvious damaged tiles/slates

□ Roof appears suitable for proposed installation

□ Roof requires further investigation

□ Roof repairs required

□ Roof replacement required before installation

Roof condition/comments:




7. ROOF STRUCTURE

□ Roof structure inspected/assessed

□ Rafters identified

□ Trusses identified

□ Roof structure appears suitable

□ Roof structure requires further investigation

□ Roof loading considered

□ Proposed fixing positions identified

□ Roof hooks/fixings suitable for roof construction

□ Mounting system compatible with roof covering

□ Structural calculations required

□ Structural engineer required

Structural comments:




8. PANEL LOCATION & ROOF LAYOUT

□ Proposed panel location identified

□ Roof orientation recorded

□ Roof pitch recorded

□ Available roof area measured/estimated

□ Panel dimensions checked

□ Panel layout completed

□ Maintenance access considered

□ Roof edge/setback considered

□ Roof obstructions identified

Roof orientation:

□ North

□ North-East

□ East

□ South-East

□ South

□ South-West

□ West

□ North-West

Roof pitch: __________________ degrees

Available roof area: ______________ m²


9. SHADING & OBSTRUCTIONS

□ Shading assessment completed

□ Trees identified

□ Chimneys identified

□ Dormers identified

□ Roof windows identified

□ Adjacent buildings identified

□ Poles/cables identified

□ Ventilation outlets identified

□ Satellite dishes identified

□ Other obstructions identified

□ No significant shading identified

Shading/comments:




10. ROOF ACCESS & WORKING AT HEIGHT

□ Safe access available

□ Scaffold required

□ Scaffold already installed

□ Roof ladder required

□ MEWP required

□ Edge protection required

□ Roof access restricted

□ Fragile roof identified

□ Safe working area available

□ Manual handling requirements assessed

□ PPE requirements identified

□ Rescue arrangements considered

□ Weather/wind conditions considered

□ Working-at-height risks assessed


11. ELECTRICAL CABLE ROUTE

□ DC cable route identified

□ AC cable route identified

□ Cable route accessible

□ Cable protection requirements assessed

□ Cable penetrations identified

□ Fire stopping requirements considered

□ Internal cable route suitable

□ External cable route suitable

□ Approximate DC cable length calculated

□ Approximate AC cable length calculated

Approximate DC cable length: ______________ m

Approximate AC cable length: ______________ m

□ DC isolation location identified

□ AC isolation location identified

□ Inverter location identified


12. INVERTER LOCATION

□ Suitable inverter location identified

□ Manufacturer clearance requirements can be achieved

□ Adequate ventilation available

□ Location protected from excessive heat

□ Location protected from water ingress

□ Suitable wall/support structure

□ Cable routes suitable

□ Accessible for maintenance

□ Isolation access considered

Proposed inverter location:



13. BATTERY LOCATION

□ Battery location identified

□ Manufacturer installation requirements checked

□ Required clearances available

□ Suitable mounting surface

□ Suitable environmental conditions

□ Access for maintenance

□ Battery isolation location identified

□ Fire safety considerations assessed

□ Battery location suitable

Proposed battery location:



14. CONSUMER UNIT / DISTRIBUTION BOARD

□ Consumer unit accessible

□ Distribution board inspected

□ Spare capacity available

□ Existing protective devices assessed

□ RCD arrangements assessed

□ Surge protection requirements assessed

□ Earthing arrangement assessed

□ Bonding arrangements assessed

□ Cable entry arrangements suitable

□ Additional consumer unit required

□ Consumer unit upgrade required

□ Electrical remedial work required

Electrical observations:




15. EARTHING & BONDING

□ Earthing arrangement identified

□ Main earthing conductor identified

□ Main bonding checked

□ Water bonding checked where applicable

□ Gas bonding checked where applicable

□ PV earthing requirements considered

□ Additional bonding required

□ Earthing requires further investigation


16. FIRE & EMERGENCY CONSIDERATIONS

□ Emergency isolation locations identified

□ Equipment remains accessible

□ Cable routes assessed

□ DC cable route minimised where practicable

□ Labelling requirements identified

□ Fire stopping requirements identified

□ Battery fire safety requirements assessed

□ Customer advised of isolation arrangements


17. PLANNING & BUILDING REQUIREMENTS

□ Planning requirements considered

□ Planning permission checked

□ Planning permission not required

□ Planning permission required

□ Conservation area checked

□ Listed building considerations checked

□ Building Regulations requirements considered

□ Building Control notification requirements considered

□ Responsibility for Building Control notification explained to customer


18. DOCUMENTATION CHECK

□ Property plans available

□ Roof plans available

□ Electrical drawings available

□ Existing installation certificates available

□ Existing PV documentation available

□ Existing DNO/NIE documentation available

□ Structural information available

□ Panel datasheet available

□ Inverter datasheet available

□ Battery datasheet available

□ Mounting system documentation available

□ Proposed system design available

□ Customer quotation available


19. PHOTOGRAPHIC SURVEY

□ Front elevation photographed

□ Rear elevation photographed

□ Roof photographed

□ Roof structure photographed where accessible

□ Consumer unit photographed

□ Electricity meter photographed

□ Service cut-out photographed

□ Earthing/bonding photographed

□ Proposed inverter location photographed

□ Proposed battery location photographed

□ Proposed cable routes photographed

□ Obstructions photographed

□ Shading sources photographed

□ Access arrangements photographed

□ Scaffolding requirements photographed


20. HEALTH & SAFETY

□ Working-at-height hazards identified

□ Electrical hazards identified

□ Manual handling hazards identified

□ Asbestos risk considered

□ Fragile surfaces considered

□ Overhead electrical equipment considered

□ Underground services considered

□ Public access considered

□ Occupiers considered

□ Children/pets considered

□ Weather exposure considered

□ Emergency access considered

□ Suitable RAMS required before installation

Additional hazards:




21. SITE SUITABILITY

□ Suitable for installation

□ Suitable subject to conditions

□ Further survey required

□ Structural assessment required

□ Electrical upgrade required

□ DNO/NIE approval required

□ Roof repairs required

□ Roof replacement required

□ Planning approval required

□ Building Control requirements outstanding

□ Not suitable for proposed system


22. ACTIONS REQUIRED BEFORE INSTALLATION

□ DNO/NIE application

□ DNO/NIE approval

□ G98 notification

□ G99 application

□ G100 export limitation

□ Structural assessment

□ Roof repairs

□ Roof replacement

□ Electrical upgrade

□ Consumer unit upgrade

□ Scaffolding

□ MEWP

□ Planning approval

□ Building Regulations notification

□ Additional documentation

□ Customer approval

Required actions:






23. CUSTOMER CONFIRMATION

□ Customer has been informed of the proposed installation

□ Customer has been informed of any identified site limitations

□ Customer has been informed of any additional works required

□ Customer has been informed of any DNO/NIE requirements

□ Customer has had the opportunity to raise questions

Customer name: ____________________________________

Customer signature: _________________________________

Date: ____ / ____ / ______


24. SURVEYOR DECLARATION

□ I confirm that I have completed this pre-installation survey accurately to the best of my knowledge.

□ I confirm that identified structural, electrical, safety and connection issues have been recorded.

□ I confirm that outstanding issues have been identified before installation.

Surveyor name: ____________________________________

Signature: _________________________________________

Date: ____ / ____ / ______


25. FINAL AUTHORISATION

□ Site survey completed

□ System design completed

□ Risk assessment completed

□ RAMS completed/required before installation

□ Product specifications checked

□ Roof mounting system checked

□ Electrical design checked

□ DNO/NIE requirements checked

□ Customer requirements confirmed

□ Installation approved to proceed

□ Installation NOT approved to proceed until outstanding actions are completed

Approved by: ______________________________________

Signature: _________________________________________

Date: ____ / ____ / ______


ADDITIONAL NOTES







Solar Shine Energy
www.solarshineni.co.uk
solarshinenergy@gmail.com

 

 

SOLAR SHINE ENERGY

SOLAR PV POST-INSTALLATION INSPECTION, TESTING & COMMISSIONING FORM

Website: www.solarshineni.co.uk
Email: solarshinenergy@gmail.com


1. INSTALLATION DETAILS

□ Customer name: ______________________________________

□ Installation address: _________________________________

□ Postcode: ___________________________________________

□ Survey / installation reference: _______________________

□ Installation date: ____ / ____ / ______

□ Inspection date: ____ / ____ / ______

□ Installer / engineer: _________________________________

□ MCS installation reference: ___________________________


2. INSTALLED SOLAR PV SYSTEM

□ Solar PV array installed as designed

□ Panel manufacturer confirmed

□ Panel model confirmed

□ Panel wattage confirmed

□ Number of panels confirmed

□ Total installed DC capacity calculated

Panel manufacturer: _________________________________

Panel model: _______________________________________

Panel wattage: __________________ W

Number of panels installed: ______________

Total DC capacity: __________________ kWp

□ Panels match approved design

□ Panels are correctly positioned

□ Panels are securely fixed

□ Mounting system installed correctly

□ All panel fixings checked

□ Roof penetrations checked

□ Roof covering checked after installation

□ No visible roof damage caused by installation


3. SOLAR ARRAY VISUAL INSPECTION

□ Panels free from visible damage

□ No cracked panels identified

□ No damaged frames identified

□ No damaged connectors identified

□ Panels correctly aligned

□ Panels securely mounted

□ Mounting rails securely fixed

□ Roof hooks securely fixed

□ End clamps correctly installed

□ Mid clamps correctly installed

□ Rail connectors correctly installed

□ End caps fitted where required

□ Cable management installed correctly

□ PV cables secured

□ PV cables protected from abrasion

□ PV cables protected from sharp edges

□ PV cables not resting directly on the roof

□ PV connectors correctly mated

□ No visible exposed live conductors


4. ARRAY CONFIGURATION

□ String configuration matches design

□ Number of strings recorded

□ String polarity checked

□ Positive and negative conductors identified

□ String labels fitted

□ String cable routes checked

□ String voltages recorded

Number of strings: __________________

String 1: __________________ panels

String 2: __________________ panels

String 3: __________________ panels

String 4: __________________ panels


5. INVERTER INSTALLATION

Manufacturer: ______________________________________

Model: _____________________________________________

Serial number: _____________________________________

Rated power: __________________ kW

□ Inverter installed according to manufacturer instructions

□ Correct mounting arrangement

□ Adequate clearances maintained

□ Adequate ventilation

□ Suitable environmental conditions

□ Inverter securely mounted

□ DC connections checked

□ AC connections checked

□ Earth connection checked

□ Communications connection checked

□ Wi-Fi/network connection checked where applicable

□ Inverter display operational

□ Inverter operating normally

□ No fault codes displayed

□ Manufacturer commissioning procedure completed


6. BATTERY SYSTEM

□ Battery installed

□ Battery manufacturer confirmed

□ Battery model confirmed

□ Battery serial number recorded

□ Battery capacity recorded

Battery manufacturer: ______________________________

Battery model: _____________________________________

Battery capacity: __________________ kWh

Serial number: _____________________________________

□ Battery installed according to manufacturer requirements

□ Battery securely mounted

□ Required clearances maintained

□ Battery location suitable

□ Battery cables correctly installed

□ Battery isolation provided

□ Battery protection installed

□ Battery communications checked

□ Battery/inverter communication established

□ Battery successfully commissioned

□ Battery state of charge checked

□ No battery fault codes


7. DC ELECTRICAL INSPECTION

□ DC wiring inspected

□ Correct cable type installed

□ Cable sizes checked

□ Polarity verified

□ DC connectors checked

□ Connectors correctly fitted

□ DC isolator installed where required

□ DC isolator correctly labelled

□ DC cable routes checked

□ Cable support adequate

□ Cable protection adequate

□ No visible cable damage

□ DC terminations secure


8. DC TESTING

Test equipment used: _________________________________

Test equipment serial number: ________________________

Calibration date: ___________________________________

String Voltage

□ String 1 open-circuit voltage recorded

String 1 Voc: __________________ V

□ String 2 open-circuit voltage recorded

String 2 Voc: __________________ V

□ String 3 open-circuit voltage recorded

String 3 Voc: __________________ V

□ String 4 open-circuit voltage recorded

String 4 Voc: __________________ V

Polarity

□ String 1 polarity correct

□ String 2 polarity correct

□ String 3 polarity correct

□ String 4 polarity correct

Insulation Resistance

□ String 1 insulation resistance tested

Result: __________________ MΩ

□ String 2 insulation resistance tested

Result: __________________ MΩ

□ String 3 insulation resistance tested

Result: __________________ MΩ

□ String 4 insulation resistance tested

Result: __________________ MΩ

□ Results recorded on test documentation


9. AC ELECTRICAL INSPECTION

□ AC cable installation inspected

□ AC cable size verified

□ AC protective device checked

□ AC isolation provided

□ AC isolator labelled

□ Connections secure

□ Cable routing suitable

□ Cable protection suitable

□ Consumer unit connection checked

□ Distribution board connection checked

□ RCD arrangements assessed

□ RCBO/RCD protection checked where applicable

□ Surge protection requirements checked

□ Earthing arrangement checked

□ Main bonding checked


10. AC ELECTRICAL TESTING

□ Continuity testing completed where applicable

□ Protective conductor continuity checked

□ Insulation resistance tested

□ Polarity confirmed

□ Earth fault loop impedance tested where applicable

□ RCD testing completed where applicable

□ Protective devices verified

□ Results recorded on electrical test certificate

Zs: __________________ Ω

RCD test result: __________________

Insulation resistance: __________________ MΩ


11. EARTHING & BONDING

□ PV installation earthing checked

□ Protective earth conductor checked

□ Main earthing conductor checked

□ Main bonding checked

□ Additional bonding checked where applicable

□ Earth connections secure

□ Earth conductors correctly identified

□ Earth continuity verified


12. LABELLING & IDENTIFICATION

□ PV array warning labels fitted

□ DC isolator labelled

□ AC isolator labelled

□ Inverter labelled

□ Battery isolation labelled where applicable

□ Consumer unit labelled

□ Generation circuit identified

□ Dual supply warning labels fitted where required

□ Shutdown/isolation information provided

□ Emergency isolation information provided

□ Labels permanent and clearly visible


13. CONSUMER UNIT / DISTRIBUTION BOARD

□ Consumer unit inspected after connection

□ PV circuit correctly identified

□ Protective device correctly rated

□ Connections secure

□ Cable entry secure

□ RCD/RCBO arrangement verified

□ Surge protection checked

□ Board cover correctly fitted

□ No exposed conductors

□ No overheating or damage observed


14. INVERTER COMMISSIONING

□ Inverter powered correctly

□ Grid connection established

□ PV generation detected

□ MPPT inputs operating

□ Battery communication established where applicable

□ Battery charging tested

□ Battery discharging tested

□ Export/import readings checked

□ Monitoring system activated

□ Customer monitoring account created

□ Monitoring app tested

□ Monitoring data received

□ Inverter firmware checked where applicable

□ No active fault codes


15. EXPORT LIMITATION / G100

□ Export limitation required

□ Export limitation not required

□ Export control device installed

□ Export control settings checked

□ Export limit programmed correctly

□ Export limitation tested

□ Fail-safe operation checked

□ Export limitation documentation completed

Maximum permitted export: ______________ kW

Configured export limit: ______________ kW


16. NIE NETWORKS / DNO

□ Applicable NIE Networks connection procedure confirmed

□ G98/NI considered

□ G99/NI considered

□ G100 considered where applicable

□ NIE Networks approval received where required

□ NIE Networks reference recorded

NIE Networks reference: ______________________________

□ Installed system matches approved application

□ Installed inverter matches approved equipment

□ Installed generation capacity matches approved design

□ Maximum export matches approved arrangement

□ Required commissioning/notification documentation completed

□ Required NIE Networks documentation submitted

□ Evidence of submission retained


17. PERFORMANCE / GENERATION CHECK

□ PV system generating electricity

□ Generation visible on inverter

□ Generation visible on monitoring platform

□ All strings operating

□ Battery operating where installed

□ Export/import readings checked

□ System performance appears consistent with site conditions

Inverter generation at commissioning: __________ kW

Battery state of charge: __________ %

Grid import: __________ kW

Grid export: __________ kW

PV generation: __________ kW


18. WEATHER / COMMISSIONING CONDITIONS

Weather: ___________________________________________

Approximate temperature: __________ °C

Time of test: __________

□ Suitable daylight available

□ Solar irradiance sufficient for testing

□ Weather conditions recorded

□ Conditions considered when assessing test results


19. FINAL SAFETY INSPECTION

□ No exposed live electrical parts

□ All covers fitted

□ All isolators accessible

□ Emergency isolation accessible

□ Equipment securely fixed

□ Cables adequately supported

□ No visible electrical damage

□ No visible roof damage

□ No water ingress identified

□ Battery installation safe

□ Inverter installation safe

□ Array installation safe

□ Access routes left safe

□ Work area cleaned

□ Installation left in safe operating condition


20. CUSTOMER HANDOVER

□ Customer shown the inverter

□ Customer shown battery system where applicable

□ Customer shown AC isolation

□ Customer shown DC isolation

□ Customer shown emergency shutdown/isolation procedure

□ Customer shown monitoring app

□ Customer shown generation information

□ Customer provided with operating instructions

□ Customer provided with maintenance information

□ Customer advised not to interfere with electrical equipment

□ Customer advised how to report faults

□ Customer advised of warranty arrangements

□ Customer received system documentation


21. HANDOVER DOCUMENTATION

□ MCS documentation completed

□ PV system verification documentation completed

□ Electrical installation certificate completed

□ Test results recorded

□ System design documentation provided

□ Panel datasheet provided

□ Inverter datasheet provided

□ Battery datasheet provided where applicable

□ Mounting system information provided

□ Manufacturer warranties provided

□ Product serial numbers recorded

□ NIE Networks documentation completed

□ G98 documentation completed where applicable

□ G99 documentation completed where applicable

□ G100 documentation completed where applicable

□ Customer operating instructions provided

□ Maintenance information provided

□ Emergency information provided


22. DEFECTS / NON-CONFORMITIES

□ No defects identified

□ Minor defect identified

□ Major defect identified

□ Electrical defect identified

□ Structural/roof defect identified

□ Labelling defect identified

□ Commissioning issue identified

□ DNO/NIE issue identified

□ Manufacturer issue identified

Defect / non-conformity details:




Corrective action required:



Responsible person: _________________________________

Target completion date: ____ / ____ / ______

□ Corrective action completed

□ Re-inspection required


23. FINAL INSTALLATION STATUS

□ PASSED – installation complete and commissioned

□ PASSED SUBJECT TO MINOR ACTIONS

□ FAILED – corrective work required

□ RE-INSPECTION REQUIRED

□ DNO/NIE documentation outstanding

□ Customer handover completed


24. INSTALLER DECLARATION

□ I confirm that the completed solar PV installation has been inspected.

□ I confirm that the relevant installation tests have been carried out.

□ I confirm that test results have been recorded.

□ I confirm that identified defects have been recorded.

□ I confirm that the installation has been commissioned in accordance with the applicable requirements and manufacturer instructions.

Installer name: ____________________________________

Company: Solar Shine Energy

Signature: _________________________________________

Date: ____ / ____ / ______


25. CUSTOMER ACCEPTANCE

□ I confirm that the solar PV system has been demonstrated to me.

□ I have been shown the isolation points.

□ I have been shown how to access the monitoring system.

□ I have received the available system documentation.

□ I understand the basic operation of the system.

Customer name: ____________________________________

Signature: _________________________________________

Date: ____ / ____ / ______


26. FINAL APPROVAL

□ Installation inspection completed

□ Electrical testing completed

□ PV array testing completed

□ Inverter commissioned

□ Battery commissioned where applicable

□ NIE Networks requirements completed

□ MCS documentation completed

□ Customer handover completed

□ Installation documentation filed

Final inspection completed by: ______________________

Signature: _________________________________________

Date: ____ / ____ / ______


ADDITIONAL NOTES







SOLAR SHINE ENERGY

Solar PV Installation • Inspection • Testing • Commissioning

Website: www.solarshineni.co.uk
Email: solarshinenergy@gmail.com